- 易迪拓培训,专注于微波、射频、天线设计工程师的培养
首页 > 电子设计 > EMC/EMI 设计 > 电磁兼容技术问答 > Ford RCU EMC Tes plan (reference) --Component / Subsystem EMC Test Plan Title Pa
Ford RCU EMC Tes plan (reference) --Component / Subsystem EMC Test Plan Title Pa
录入:edatop.com 点击:
Component / Subsystem EMC Test Plan Title Page
Product Name: Wireless FES Remote Control
Product Supplier Name:
Product Design Engineer:
Ford Recognized EMC Test Facility(s) used:
Dayton T. Brown, Inc., Attn: Mr. Tom Arcati
1195 Church St.
Bohemia, NY 11716
Product Manager:
Product Part Number(s):
FS-6L2T-18C919-AA
Vehicles & Model Year using this product:
07MY U222/228, 07MY U287/288, 07MY P356,
07MY U387/388, 07MY U354
Product Manufacturing Location(s)
EMC Specification Used:
ES-XW7T-1A278-AC
I certify that the information contained in this test plan is factual including description of the product operation, correct functional
classifications, and acceptance criteria.I understand and agree that any subsequent changes to this test plan prior to design verification
testing shall be communicated to the FMC EMC department.Any changes or revisions to this test plan after test completion shall require
written technical justification and approval by the same EMC department.I understand that failure to follow this process may result in non-
acceptance of the product's EMC test data by the FMC EMC department.I also understand and acknowledge that requirements validated
via this test plan are relevant only to the specific vehicles that the product is to be fitted to.Use of the product on other vehicle platforms
may require additional EMC performance requirements, which will necessitate additional verification testing of the product.I certify that
the product samples submitted for EMC testing are of a production representative design.I agree to submit a summary report directly to
the FMC EMC department no later than five (5) business days following completion of testing.I also agree to forward a copy of the test
laboratory's detailed test report directly to the FMC EMC department within thirty (30) business days following completion of testing.
Ford RCU EMC Tes plan (reference).[bbs.rfeda.cn].rar (282 K)
Product Name: Wireless FES Remote Control
Product Supplier Name:
Product Design Engineer:
Ford Recognized EMC Test Facility(s) used:
Dayton T. Brown, Inc., Attn: Mr. Tom Arcati
1195 Church St.
Bohemia, NY 11716
Product Manager:
Product Part Number(s):
FS-6L2T-18C919-AA
Vehicles & Model Year using this product:
07MY U222/228, 07MY U287/288, 07MY P356,
07MY U387/388, 07MY U354
Product Manufacturing Location(s)
EMC Specification Used:
ES-XW7T-1A278-AC
I certify that the information contained in this test plan is factual including description of the product operation, correct functional
classifications, and acceptance criteria.I understand and agree that any subsequent changes to this test plan prior to design verification
testing shall be communicated to the FMC EMC department.Any changes or revisions to this test plan after test completion shall require
written technical justification and approval by the same EMC department.I understand that failure to follow this process may result in non-
acceptance of the product's EMC test data by the FMC EMC department.I also understand and acknowledge that requirements validated
via this test plan are relevant only to the specific vehicles that the product is to be fitted to.Use of the product on other vehicle platforms
may require additional EMC performance requirements, which will necessitate additional verification testing of the product.I certify that
the product samples submitted for EMC testing are of a production representative design.I agree to submit a summary report directly to
the FMC EMC department no later than five (5) business days following completion of testing.I also agree to forward a copy of the test
laboratory's detailed test report directly to the FMC EMC department within thirty (30) business days following completion of testing.
Ford RCU EMC Tes plan (reference).[bbs.rfeda.cn].rar (282 K)
EMC电磁兼容设计培训套装,视频教程,让您系统学习EMC知识...
射频工程师养成培训教程套装,助您快速成为一名优秀射频工程师...
上一篇:SystemC21手册
下一篇:RF_and_EMC_in_PCB