- 易迪拓培训,专注于微波、射频、天线设计工程师的培养
ADS - optimization
I am just starting to use it and either I am doing something wrong or I interpret the results wrongly.
My variables are defined in 'mils', however the optimization seems to take it in meters (!). I correlated the numbers and they match.
Am I missing here somethig?
Tx
Kato01
You must miss something.
Everyone with experience of ADS would suffer this .
Be patient and check all your setting.
to get away from this problem, I always use metric and engineering number representation ( 5e-12 for 5pF).
a mil is 1/1000 of an inch (a milli-inch?). it is not a millimeter (metric) but english measure. quite commonly used measurement in the US for PCB design
T continue the above here is an example:
10 mil = 0.254 mm
I think there are 2 places for defining the unit for a project. Can't name them now, check the manual.
Why doesn't the original user upload his original ADS file and we senior users do the diagonosis?
申明:网友回复良莠不齐,仅供参考。如需专业帮助,请学习易迪拓培训专家讲授的ADS视频培训课程。
上一篇:Finding .S2P file in ADS, help please
下一篇:Circuit implementation in ADS
国内最全面、最专业的Agilent ADS培训课程,可以帮助您从零开始,全面系统学习ADS设计应用【More..】
- Agilent ADS教学培训课程套装
- 两周学会ADS2011、ADS2013视频教程
- ADS2012、ADS2013射频电路设计详解
- ADS高低阻抗线微带滤波器设计培训教程
- ADS混频器仿真分析实例视频培训课程
- ADS Momentum电磁仿真设计视频课程
- ADS射频电路与通信系统设计高级培训
- ADS Layout和电磁仿真设计培训视频
- ADS Workspace and Simulators Training Course
- ADS Circuit Simulation Training Course
- ADS Layout and EM Simulation Training Course
- Agilent ADS 内部原版培训教材合集