• 易迪拓培训,专注于微波、射频、天线设计工程师的培养
首页 > AWR > AWR学习交流论坛 > How to setup STACKUP in MWO for heatsinks with cavity?

How to setup STACKUP in MWO for heatsinks with cavity?

录入:edatop.com     点击:
hello,

i have a structure in MWO with the following layers:

a. top metal (RF lines, GND, vias to bot metal)
b. fr4 substrate (dielectric)
c. bot metal (RF line, GND, vias from top metal)
d. heatsink with cavity (cavity below the RF line of bot metal)

question: how do you setup the stackup for this in MWO? top and bot boundary i set to air...

AWR Microwave Office 培训课程套装,视频教学,帮助您快速学习掌握MWO...

上一篇:File - rfpa_mwo.zip needed
下一篇:MWO中的YIELD项

MWO培训课程推荐详情>>

  网站地图